Section 25-26 Fuselage
....Nov 21, 2020

Got word from Van's that the fuse is being shipped. Have received the Bill of Lading from ABF, so it is on the way. I am scrambling trying to find a place for it... not ready just yet. But, another step forward.


 

Preliminary Avionics
....Nov 3, 2020

Stein Air Panel Design. Have been working with Stein on finishing up the panel. I had a good idea of what I wanted, so it was a matter of filling in the blanks. Pretty happy with how the final panel turned out. The PDF of the final panel design is posted to the drawings page.


 

Section 8 - Horizontal Stabilizer
....Oct 21, 2020

Hor. stab video montage update. Haven't been very productive over the past couple months. But, finally got all of the hor stab parts drilled, dimpled and primed. Started applying some rivets tonight. Want to get this knocked out and move on to the elevators. Spoke with Van's this week and QB fuse should be delivered in another month or two... so, need to get on to the tail cone.


 

Section 24 - Wing Tips
....Oct 7, 2020

Zip Tips arrived today. Don't yet have wings to put them on, but... here they are. Will be a few months before I order the wings, so off to the side they go for now. ---> Zip Tips <---


 

Preliminary Avionics
....Sept 27, 2020

Soldered up the first test board. A few minor mistakes on the PCB, but I can get this to work sufficiently for testing. Make a face plate and starting writing some code.


 

Horizontal Stab Contd
....Sept 21, 2020

Havent been very productive on the Hor stab over the past couple of months. Was busy and distracted on the new office project. I incorrectly thought I could push this permitting process to 3 months or so... nope. Just working through some easement issues, local governmental site related approvals... very slow process. So, time to get back to work. Want to get this hor section finished before the end of October. Channeling my best Mike Patey.. "Back to work."


 

Preliminary Avionics
....Sept 14, 2020

PCB's have arrived ! Have a few parts I am still waiting on. Will get this soldered up and tested. There will be a number of iterations of this, so this is purely an initial test bed.


 

Preliminary Avionics
....Sept 4, 2020

Have worked through a first draft of the annunciator idea.. four alluminated buttons, a 15 pin D-Sub connector for input... will have the PCB in a few weeks and will start playing with this.


 

Preliminary Avionics
....Aug 12, 2020

Started thinking through an Annuciator panel. Found some nice multi-color LED push buttons I am going to play with. Thinking a custom PCB with inputs and outputs direct to the G3X. May or may not work in a microcontroller for additional features... [Edit 8/18/20] Yes, for sure will have a micocontroller involed... so many additional features can be incorportated... Will post a stand alone step by step on this... will be a fun side project.


 

Section 8 - Horizontal Stabilizer
....July 26, 2020

All of the horizontal stab parts have been assembled, match drilled taken back apart and deburred. Starting to dimple everything... then primer and back to rivetting !


 


Page 2    |   << Page 3 >>    |    Page 4

Entries Posted To Date :: 67





 

 
Status / Completed

08/01/21 - QB Wings Ordered
05/15/21 - New QB Fuse Delivered
04/25/21 - QB Fuse Returned
04/09/21 - Instrument Panel Delivered
12/2/20 - QB Fuse Delivered
11/29/20 - Hor. Stab Complete
05/2/20 - Rudder Completed
03/20/20 - Ordered QB Fuse
02/26/20 - V. Stab Completed
02/07/20 - Reserved N584TA
01/24/20 - Start Vertical Stabilizer
01/16/20 - Building Work Tables
01/02/20 - Ordered Empennage Kit
12/27/19 - Ordered Tools Cleaveland Tools Kit
8/2/19 - Preliminary Schedule Complete
7/5/19 - Working through preliminay schedule
7/1/19 - Planning, researching, etc.


   TonysRV10.com
Home | Contact Me | Helpful Links | N584TA | About Me
 Tony's RV-10 Build   Mar-28-2024   
Van's Aircraft
Van's Home Page
RV-10 Page
RV-10 Specs
Van's Air Force
Facebook Pages
RV-10 Group
Vans Aircraft Builders
Zenith Aircraft
Airplane Kit Building
EAA
Kitplanes Magazine
Homebuilt Homepage
Other Great Airplane Kits
Zenith Aircraft Company
Kitfox Aircraft
Sonex Aircraft
The Airplane Factory



Copyright 2019-2024 tonysrv10.com all rights reserved