TonysRV10.com
Home | Contact Me | Helpful Links | N584TA | About Me
 Tony's RV-10 Build   Jul-3-2020   


  Sect 8 - Horizontal Stabilizer
  Sect 7 - Rudder Assembly
  Sect 6 - Vert. Stabilizer
  Building Work Tables













Tony's Build of the Van's Aircraft RV-10

<< Page 1 >>    |    Page 2

Paint Scheme Options
....June 30, 2020

Can't say enough good things about Jonathan and --> Paint Schemer <-- . Really tallented and a very well managed process. Two thumbs up. Makes me want to rush through the build to get to the paint !!


 

Paint Scheme Options
....June 20, 2020

Working with Jonathan at Paint Schemers on the paint... Obviously, I am a long way away from painting. Have plenty of time to work through options. The family thought it would be fun to do a Clemson themed airplane. Couple of the options Jonathan came up with. BTW, he is in Alabama... :)


 

Horizontal Stab Video
....June 10, 2020

Continuing video clips of the horizontal stab build. Vans does a good job of slowly working you into larger and more involved parts...


 

Section 8 - Horizontal Stabilizer
....May 31, 2020

Have the skins mostly clecoed into place. Match drilling lots of holes next.


 

Shop / Workspace
....May 29, 2020

Small change in schedule. I ordered the QB fuse for delivery in July '20. The plan was to renovate our walkout basement to allow a wide door and build there. A property came available very near my residence. So, we decided to build a new building. In this building I am including a rear shop space for the build. You can never have too much shop space ! Anyway, I asked Vans to delay the fuse delivery until October or November. Result is an approximate 3 or 4 month delay to the schedule.


 

Section 8 - Horizontal Stabilizer
....May 23, 2020

Have been making slow progress on the horizontal stab. Front and center ribs are primed and riveted. The front and middle formers are in place. Support forms made and ready to start clecoing the skins on.


 

Rudder Build Video
....May 7, 2020

Short video / slide show of the rudder build added / updated to the top of the rudder page.


 

Fuselage Cradle
....May 3, 2020

Dr. Ken Sauve's QB fuselage arrived this weekend. While trying to set the fuse into the cradle the wing spar bolts conflicted slightly with the E restraint. Dr. Ken was kind enough to send me pictures and offer a suggested modification. New cradle drawings are posted showing a narrowed E element on both sides. Thanks again Dr. Ken !


 

Section 7 - Rudder
....May 2, 2020

Made up a simple bender to insure a nice straight clean bent edges at the counter weight. Worked out great and real simple.


 

Preliminary Avionics
....May 2, 2020

Panel Option 4.2 - This is the panel. I don't think the 650 will fit at the top... too deep and will conflict with bracing. Reasonably happy with this layout. The switches, etc will change as other component decisions are made.


 


<< Page 1 >>    |    Page 2

Entries Posted To Date :: 35





 

 
Status / Completed

03/20/20 - Ordered QB Fuse
02/26/20 - V. Stab Completed
02/07/20 - Reserved N584TA
01/24/20 - Start Vertical Stabilizer
01/16/20 - Building Work Tables
01/02/20 - Ordered Empennage Kit
12/27/19 - Ordered Tools Cleaveland Tools Kit
8/2/19 - Preliminary Schedule Complete
7/5/19 - Working through preliminay schedule
7/1/19 - Planning, researching, etc.


   TonysRV10.com
Home | Contact Me | Helpful Links | N584TA | About Me
 Tony's RV-10 Build   Jul-3-2020   
Van's Aircraft
Van's Home Page
RV-10 Page
RV-10 Specs
Van's Air Force
Facebook Pages
RV-10 Group
Vans Aircraft Builders
Zenith Aircraft
Airplane Kit Building
EAA
Kitplanes Magazine
Homebuilt Homepage
Other Great Airplane Kits
Zenith Aircraft Company
Kitfox Aircraft
Sonex Aircraft
The Airplane Factory



Copyright 2019-2020 tonysrv10.com all rights reserved